Scout V 0.8 Test Launch

With an entirely new thrust vectorin' system, me bucko, Scout V 0.8 corrected well for it's orientation with two caveats. T' first bein' that due t' errors within a computer simulation o' t' flight, me hearties, t' liftoff weight be much too heavy t' allow for a suitable apogee. T' second bein' that t' onboard PID system was runnin' for roughly 30 seconds before liftoff, me hearties, and too much error was accumulated durin' that time t' maintain a zero-position in t' TVC mount. 

 Rocketry Product: BPS.space - Signal {Component} (R2) [2018-]

Author BPS.space
Duration 54 seconds

comment Post a Comment